Title :
Two-machine no-wait flowshop scheduling with availability constraints and release dates
Author :
Ben Chihaoui, F. ; Dridi, Najoua ; Hadj-Alouane, Atidel B.
Author_Institution :
OASIS, Ecole Nat. d´´Ing. de Tunis, Tunis, Tunisia
Abstract :
The two-machine no-wait flowshop problem with availability constraints and release dates is studied in this paper. We work under the assumption that each machine is unavailable during a time interval. The intervals overlap and are known in advance. Two heuristics based on Gilmore-Gomory and Cheng and Liu algorithms are proposed for this problem. An experimental study is conducted to evaluate the performance of the proposed heuristics.
Keywords :
flow shop scheduling; minimisation; Gilmore-Gomory-Cheng-Liu algorithm; availability constraint; makespan minimization; release date; two-machine no-wait flowshop scheduling; Availability; Buffer storage; Continuous production; Job shop scheduling; Manufacturing systems; Modems; Parallel machines; Polynomials; Processor scheduling; Robot sensing systems; flow shop; machine availability constraint; no wait; release dates;
Conference_Titel :
Computers & Industrial Engineering, 2009. CIE 2009. International Conference on
Conference_Location :
Troyes
Print_ISBN :
978-1-4244-4135-8
Electronic_ISBN :
978-1-4244-4136-5
DOI :
10.1109/ICCIE.2009.5223750