Title :
Life cycle cost model for evaluating RAMS requirements for rolling stocks
Author :
Jong-Woon Kim ; Chung, Jong-Duk ; Han, Seok-Yun
Author_Institution :
Korea Railroad Res. Inst., Ui-wang, South Korea
Abstract :
We need to consider not only service quality but also the purchase and maintenance cost when setting the RAMS requirements for rolling stock. This article suggests one indicator to evaluate the effectiveness of the RAMS requirements which is LCC (life cycle cost). A new LCC model is suggested which is based on LCC elements affected by RAMS requirements. Acquisition cost, maintenance cost and hazard cost are considered as LCC elements.
Keywords :
life cycle costing; railway rolling stock; reliability; RAMS requirement; acquisition cost; hazard cost; life cycle cost model; maintenance cost; reliability-availability-maintainability-safety performance; rolling stock; Availability; Costs; Hazards; Logistics; Performance evaluation; Preventive maintenance; Rail transportation; Railway safety; Time measurement; Life cycle cost; RAMS; reliability;
Conference_Titel :
Computers & Industrial Engineering, 2009. CIE 2009. International Conference on
Conference_Location :
Troyes
Print_ISBN :
978-1-4244-4135-8
Electronic_ISBN :
978-1-4244-4136-5
DOI :
10.1109/ICCIE.2009.5223870