• DocumentCode
    3155589
  • Title

    Production planning and cell formation in dynamic virtual cellular manufacturing systems with worker flexibility

  • Author

    Mahdavi, Iraj ; Aalaei, Amin ; Paydar, Mohammad Mahdi ; Solimanpur, Maghsud

  • Author_Institution
    Dept. of Ind. Eng., Mazandaran Univ. of Sci. & Technol., Babol, Iran
  • fYear
    2009
  • fDate
    6-9 July 2009
  • Firstpage
    663
  • Lastpage
    667
  • Abstract
    Most traditional cell formation problem procedures ignore any changes in demand and part mix variation. However, in today´s business environment, products life cycles are short, and demand volumes and product mix can vary frequently. In this paper, a new mathematical model for production planning in a dynamic virtual cellular manufacturing system is developed under conditions of multi period planning horizons, with demand and part mix variation and worker flexibility. To validate and verify the proposed model, two examples are solved by LINGO software package.
  • Keywords
    cellular manufacturing; mathematical programming; production planning; programming languages; virtual manufacturing; LINGO software package; cell formation; multi period planning horizons; product demand mix; product life cycles; production planning; virtual cellular manufacturing systems; worker flexibility; Capacity planning; Cellular manufacturing; Costs; Ducts; Mathematical model; Production planning; Reactive power; Robots; Subcontracting; Virtual manufacturing; Dynamic Virtual Cellular Manufacturing System; Production Planning; Worker Flexibility;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computers & Industrial Engineering, 2009. CIE 2009. International Conference on
  • Conference_Location
    Troyes
  • Print_ISBN
    978-1-4244-4135-8
  • Electronic_ISBN
    978-1-4244-4136-5
  • Type

    conf

  • DOI
    10.1109/ICCIE.2009.5223872
  • Filename
    5223872