DocumentCode
3156051
Title
Project scheduling under resource constraints: Application of the cumulative global constraint
Author
Trojet, Mariem ; Mida, Fehmi H. ; Lopez, Pierre
Author_Institution
UR MSSDT ESSTT, Tunis, Tunisia
fYear
2009
fDate
6-9 July 2009
Firstpage
62
Lastpage
67
Abstract
This paper concerns project scheduling under resource constraints. The objective is to find a solution that minimizes the project makespan, while respecting the precedence constraints and the resource constraints. The problem under consideration is modelled as a constraint satisfaction problem (CSP). It is implemented under the constraint programming language CHIP V5. For modelling the resource constraints, we are particularly interested in the application of the cumulative global constraint. The provided solutions determine values for the various variables associated to the tasks realized on each resource, as well as the curves with the profile of the total consumption of resources on time.
Keywords
constraint handling; constraint theory; scheduling; CHIP V5 language; constraint programming language; constraint satisfaction problem; cumulative global constraint; precedence constraint; production scheduling; project makespan; project scheduling; resource constraint; Artificial intelligence; Computer languages; Filtering algorithms; Graph theory; Indium phosphide; Linear programming; Mathematical programming; Optimization methods; Production; Uninterruptible power systems; Production scheduling; constraint programming; constraint satisfaction problem; cumulative global constraint;
fLanguage
English
Publisher
ieee
Conference_Titel
Computers & Industrial Engineering, 2009. CIE 2009. International Conference on
Conference_Location
Troyes
Print_ISBN
978-1-4244-4135-8
Electronic_ISBN
978-1-4244-4136-5
Type
conf
DOI
10.1109/ICCIE.2009.5223894
Filename
5223894
Link To Document