• DocumentCode
    3156976
  • Title

    A heuristic algorithm for integrated scheduling problem of container handling system

  • Author

    Liang, Liang ; Lu Zhi-Qiang ; Zhou Bing-Hai

  • Author_Institution
    Dept. of Ind. Eng. & Manage., Shanghai Jiao Tong Univ., Shanghai, China
  • fYear
    2009
  • fDate
    6-9 July 2009
  • Firstpage
    40
  • Lastpage
    45
  • Abstract
    The integrated scheduling problem of the container handling system in container terminals is presented as a mixed integer programming model with the predefined operation constraints, sequence depended setup time and interference constraints for quay cranes. Based on the characteristics of container terminal operations, a heuristic algorithm is developed to solve this problem under the condition that container handling system is dealing with discharging or loading jobs only. Furthermore, the lower bound of the problem is suggested. And the numerical experiments show the algorithm effective and efficient comparing to lower bound, particularly for large scale problems.
  • Keywords
    algorithm theory; boundary-value problems; containers; integer programming; materials handling; scheduling; container handling system; container terminals; heuristic algorithm; integrated scheduling; mixed integer programming model; operation constraints; quay cranes; Containers; Cranes; Genetic algorithms; Heuristic algorithms; Interference constraints; Job shop scheduling; Linear programming; Marine vehicles; Scheduling algorithm; Time factors; container handling system; integrated scheduling; predefined operation constraint; sequence-depended setup time;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computers & Industrial Engineering, 2009. CIE 2009. International Conference on
  • Conference_Location
    Troyes
  • Print_ISBN
    978-1-4244-4135-8
  • Electronic_ISBN
    978-1-4244-4136-5
  • Type

    conf

  • DOI
    10.1109/ICCIE.2009.5223935
  • Filename
    5223935