• DocumentCode
    3162653
  • Title

    Realization of foundation pit dewatering visualization

  • Author

    Li, Jiyun ; Pei, Hongxing

  • Author_Institution
    Inf. Eng. Dept., Henan Polytech., Zhengzhou, China
  • fYear
    2011
  • fDate
    16-18 April 2011
  • Firstpage
    4288
  • Lastpage
    4291
  • Abstract
    Make use of the principle of steady flow and unsteady flow of groundwater dynamics, introducing the method of groundwater level real time prediction around the foundation pit in the process of disturbed wells dewatering. The best arithmetic was selected after the Cross Validation. Based on interpolation arithmetic selected before, visualization of dewatering was realized. It has some certain meaning to analysis the influence of the engineering of dewatering upon the surroundings environment.
  • Keywords
    flow; foundations; groundwater; interpolation; disturbed wells dewatering; foundation pit dewatering visualization; groundwater dynamics; groundwater level real time prediction; interpolation arithmetic; unsteady flow; Buildings; Computers; Interpolation; Software; Three dimensional displays; Visualization; dewatering of foundation pit; interpolation; validity evaluation; visualization;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Consumer Electronics, Communications and Networks (CECNet), 2011 International Conference on
  • Conference_Location
    XianNing
  • Print_ISBN
    978-1-61284-458-9
  • Type

    conf

  • DOI
    10.1109/CECNET.2011.5768980
  • Filename
    5768980