DocumentCode
3162653
Title
Realization of foundation pit dewatering visualization
Author
Li, Jiyun ; Pei, Hongxing
Author_Institution
Inf. Eng. Dept., Henan Polytech., Zhengzhou, China
fYear
2011
fDate
16-18 April 2011
Firstpage
4288
Lastpage
4291
Abstract
Make use of the principle of steady flow and unsteady flow of groundwater dynamics, introducing the method of groundwater level real time prediction around the foundation pit in the process of disturbed wells dewatering. The best arithmetic was selected after the Cross Validation. Based on interpolation arithmetic selected before, visualization of dewatering was realized. It has some certain meaning to analysis the influence of the engineering of dewatering upon the surroundings environment.
Keywords
flow; foundations; groundwater; interpolation; disturbed wells dewatering; foundation pit dewatering visualization; groundwater dynamics; groundwater level real time prediction; interpolation arithmetic; unsteady flow; Buildings; Computers; Interpolation; Software; Three dimensional displays; Visualization; dewatering of foundation pit; interpolation; validity evaluation; visualization;
fLanguage
English
Publisher
ieee
Conference_Titel
Consumer Electronics, Communications and Networks (CECNet), 2011 International Conference on
Conference_Location
XianNing
Print_ISBN
978-1-61284-458-9
Type
conf
DOI
10.1109/CECNET.2011.5768980
Filename
5768980
Link To Document