DocumentCode :
3162653
Title :
Realization of foundation pit dewatering visualization
Author :
Li, Jiyun ; Pei, Hongxing
Author_Institution :
Inf. Eng. Dept., Henan Polytech., Zhengzhou, China
fYear :
2011
fDate :
16-18 April 2011
Firstpage :
4288
Lastpage :
4291
Abstract :
Make use of the principle of steady flow and unsteady flow of groundwater dynamics, introducing the method of groundwater level real time prediction around the foundation pit in the process of disturbed wells dewatering. The best arithmetic was selected after the Cross Validation. Based on interpolation arithmetic selected before, visualization of dewatering was realized. It has some certain meaning to analysis the influence of the engineering of dewatering upon the surroundings environment.
Keywords :
flow; foundations; groundwater; interpolation; disturbed wells dewatering; foundation pit dewatering visualization; groundwater dynamics; groundwater level real time prediction; interpolation arithmetic; unsteady flow; Buildings; Computers; Interpolation; Software; Three dimensional displays; Visualization; dewatering of foundation pit; interpolation; validity evaluation; visualization;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Consumer Electronics, Communications and Networks (CECNet), 2011 International Conference on
Conference_Location :
XianNing
Print_ISBN :
978-1-61284-458-9
Type :
conf
DOI :
10.1109/CECNET.2011.5768980
Filename :
5768980
Link To Document :
بازگشت