Maintaining regional reliability during expansion of the Maury 500-kV GIS facility
Author
Petty, Randal
Author_Institution
Electr. Syst. Projects, Tennessee Valley Authority, Chattanooga, TN, USA
fYear
2010
fDate
11-14 Oct. 2010
Firstpage
669
Lastpage
671
Abstract
Staged expansion of 500-kV GIS switchgear was completed at the Maury 500-kV Substation without impact to system performance based upon proper planning and execution of the work being performed.
Keywords
gas insulated substations; gas insulated switchgear; power transmission reliability; GIS; reliability maintainance; staged expansion; substation; switchgear; voltage 500 kV; Geographic Information Systems; Power transmission lines; Reliability; Springs; Substations; Switchgear; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
High Voltage Engineering and Application (ICHVE), 2010 International Conference on
Conference_Location
New Orleans, LA
Print_ISBN
978-1-4244-8283-2
Type
conf
DOI
10.1109/ICHVE.2010.5640792
Filename
5640792
Link To Document