DocumentCode
3165750
Title
Partitioning and scheduling of asynchronous pipelines
Author
Kuo, Yau-Hwang ; Lo, Shaw-Pyng
Author_Institution
Inst. for Inf. Eng., Nat. Cheng Kung Univ., Tainan, Taiwan
fYear
1992
fDate
4-8 May 1992
Firstpage
574
Lastpage
579
Abstract
The authors propose algorithms for partitioning and scheduling of asynchronous pipelines. Resource sharing is taken into account. The focus is on the automated data path synthesis of asynchronous pipelines. A heuristic algorithm based on a probabilistic approach is described for partitioning the circuit description into pipelined stages. Some mathematical formulas and a clique partitioning approach are proposed to determine resource sharable stages. A simulated evolution algorithm is outlined for scheduling operations into stages. Experiments and simulations have confirmed the efficiency of the algorithms.<>
Keywords
circuit layout CAD; scheduling; simulated annealing; algorithms; asynchronous pipelines; automated data path synthesis; clique partitioning; heuristic algorithm; partitioning; probabilistic approach; resource sharable stages; resource sharing; scheduling; simulated evolution algorithm; Circuit simulation; Circuit synthesis; Clocks; Delay; Integrated circuit interconnections; Latches; Partitioning algorithms; Pipelines; Resource management; Scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
CompEuro '92 . 'Computer Systems and Software Engineering',Proceedings.
Conference_Location
The Hague, Netherlands
Print_ISBN
0-8186-2760-3
Type
conf
DOI
10.1109/CMPEUR.1992.218470
Filename
218470
Link To Document