DocumentCode :
3173800
Title :
Schedule management method study of middle and small software projects
Author :
Zhang Jun-guang
Author_Institution :
Sch. of Econ. & Manage., Univ. of Sci. & Technol.(USTB), Beijing, China
fYear :
2011
fDate :
8-10 Aug. 2011
Firstpage :
1495
Lastpage :
1498
Abstract :
To overcome the shortcoming of software project schedule estimation method and improve the success rate of software projects, a systemic method of software project schedule management was studied combined with some actual project cases. Considering the feature of middle and small-sized software projects, the effort and the stage effort distribution were obtained and divided to get the schedule. During the schedule division, the reliability and usability of the resources were ensured by reconciling the resources. The further division and the monitoring and control of the schedule plan were also studied. The actual data indicate that this model could be used for schedule management of middle and small software projects effectively and could obtain continuous improvement.
Keywords :
continuous improvement; project management; scheduling; software management; software reliability; software reusability; continuous improvement; middle and small software projects; resource reliability; resource usability; schedule division; schedule management method study; schedule plan monitoring; software project schedule estimation method; software project schedule management; stage effort distribution; Capability maturity model; Estimation; Monitoring; Organizations; Project management; Schedules; Software; Deviation; Middle and small software project; Monitoring and control; Schedule estimation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Artificial Intelligence, Management Science and Electronic Commerce (AIMSEC), 2011 2nd International Conference on
Conference_Location :
Deng Leng
Print_ISBN :
978-1-4577-0535-9
Type :
conf
DOI :
10.1109/AIMSEC.2011.6010584
Filename :
6010584