DocumentCode
3176583
Title
Research on bid evaluation optimal model of engineering project based on ELECTRE-II
Author
Wu, Yunna ; Huang, Yong ; Huang, Xin
Author_Institution
Sch. of Econ. & Manage., North China Electr. Power Univ., Beijing, China
fYear
2011
fDate
8-10 Aug. 2011
Firstpage
1365
Lastpage
1368
Abstract
The core work of bidding evaluation process in engineering projects is to take scientific decision-making method to select better and limited bidding schemes. On the basis of bid optimal model of ELECTRE-I method, introduced higher-level relation to select better bid scheme but ignored the extent of higher-level relation. Taking this factor into consideration, this article put forward the ELECTRE-II method, introduced strong-higher-level relation and weak-higher-level relation to select better bid scheme and test the validity of this method by case study.
Keywords
civil engineering; construction industry; decision making; project management; ELECTRE-II; bid evaluation optimal model; bidding scheme; construction project; engineering project; scientific decision-making method; strong-higher-level relation; weak-higher-level relation; Clocks; Decision making; Economics; Optimization; Reliability engineering; Standardization; Weight measurement; ELECTRE-II method; G1 method; Project bidding evaluation;
fLanguage
English
Publisher
ieee
Conference_Titel
Artificial Intelligence, Management Science and Electronic Commerce (AIMSEC), 2011 2nd International Conference on
Conference_Location
Deng Leng
Print_ISBN
978-1-4577-0535-9
Type
conf
DOI
10.1109/AIMSEC.2011.6010735
Filename
6010735
Link To Document