DocumentCode :
3180064
Title :
Generation of precedence graphs for a product family using a disassembly approach
Author :
Fouda, Patrick ; De Lit, Pierre ; Rekiek, Brahim ; Delchambre, Alain
Author_Institution :
CAD/CAM Dept., Univ. Libre de Bruxelles, Belgium
fYear :
2001
fDate :
2001
Firstpage :
226
Lastpage :
231
Abstract :
The design of an assembly system is generally composed of two main steps, namely assembly planning and resource planning. The paper focuses on the first issue, which consists in generating the assembly plans of the product. A method to generate and to evaluate a set of assembly plans for a product family, using a disassembly approach is proposed. The plan evaluation is performed by a multicriteria decision-aid method (PROMETHEE). The method is applied to an industrial case study and the corresponding results are presented
Keywords :
CAD; assembly planning; decision theory; graph theory; matrix algebra; PROMETHEE; disassembly approach; multicriteria decision-aid method; plan evaluation; precedence graphs; product family; Assembly systems; CADCAM; Computer aided manufacturing; Design automation; Machinery production industries; Performance evaluation; Robotic assembly; Robots; Shape; Tree graphs;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Assembly and Task Planning, 2001, Proceedings of the IEEE International Symposium on
Conference_Location :
Fukuoka
Print_ISBN :
0-7803-7004-X
Type :
conf
DOI :
10.1109/ISATP.2001.928994
Filename :
928994
Link To Document :
بازگشت