DocumentCode
3180080
Title
Hoist scheduling problem: an approach based on constraint logic programming
Author
Baptiste, Pierre ; Legeard, Bruno ; Varnier, Christophe
Author_Institution
CNRS, Besnacon
fYear
1992
fDate
12-14 May 1992
Firstpage
1139
Abstract
Scheduling the movements of a hoist in printed circuit board electroplating is known is the hoist scheduling problem (HSP). The objective of the HSP is to find an optimal cyclic sequence of moves for hoists. Results are already available for this problem, using classical operational research tools. They are briefly presented. Most of the proposed solutions are limited to the very specific initial model and are consequently difficult to apply in industrial problems. The constraint logic programming (CLP) approach to the problem is presented. A CLP model of the problem that allows modeling and solving more realistic cases is presented, and the results and the analysis of the solutions are outlined
Keywords
computer aided production planning; electronic engineering computing; electroplating; hoists; logic programming; printed circuit manufacture; scheduling; PCB; constraint logic programming; hoist scheduling problem; optimal cyclic sequence; printed circuit board electroplating; Automatic control; Chemical products; Collaboration; Job shop scheduling; Logic programming; Printed circuits; Production facilities; Rails; Roentgenium; Routing;
fLanguage
English
Publisher
ieee
Conference_Titel
Robotics and Automation, 1992. Proceedings., 1992 IEEE International Conference on
Conference_Location
Nice
Print_ISBN
0-8186-2720-4
Type
conf
DOI
10.1109/ROBOT.1992.220195
Filename
220195
Link To Document