DocumentCode :
3180080
Title :
Hoist scheduling problem: an approach based on constraint logic programming
Author :
Baptiste, Pierre ; Legeard, Bruno ; Varnier, Christophe
Author_Institution :
CNRS, Besnacon
fYear :
1992
fDate :
12-14 May 1992
Firstpage :
1139
Abstract :
Scheduling the movements of a hoist in printed circuit board electroplating is known is the hoist scheduling problem (HSP). The objective of the HSP is to find an optimal cyclic sequence of moves for hoists. Results are already available for this problem, using classical operational research tools. They are briefly presented. Most of the proposed solutions are limited to the very specific initial model and are consequently difficult to apply in industrial problems. The constraint logic programming (CLP) approach to the problem is presented. A CLP model of the problem that allows modeling and solving more realistic cases is presented, and the results and the analysis of the solutions are outlined
Keywords :
computer aided production planning; electronic engineering computing; electroplating; hoists; logic programming; printed circuit manufacture; scheduling; PCB; constraint logic programming; hoist scheduling problem; optimal cyclic sequence; printed circuit board electroplating; Automatic control; Chemical products; Collaboration; Job shop scheduling; Logic programming; Printed circuits; Production facilities; Rails; Roentgenium; Routing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Robotics and Automation, 1992. Proceedings., 1992 IEEE International Conference on
Conference_Location :
Nice
Print_ISBN :
0-8186-2720-4
Type :
conf
DOI :
10.1109/ROBOT.1992.220195
Filename :
220195
Link To Document :
بازگشت