• DocumentCode
    3180080
  • Title

    Hoist scheduling problem: an approach based on constraint logic programming

  • Author

    Baptiste, Pierre ; Legeard, Bruno ; Varnier, Christophe

  • Author_Institution
    CNRS, Besnacon
  • fYear
    1992
  • fDate
    12-14 May 1992
  • Firstpage
    1139
  • Abstract
    Scheduling the movements of a hoist in printed circuit board electroplating is known is the hoist scheduling problem (HSP). The objective of the HSP is to find an optimal cyclic sequence of moves for hoists. Results are already available for this problem, using classical operational research tools. They are briefly presented. Most of the proposed solutions are limited to the very specific initial model and are consequently difficult to apply in industrial problems. The constraint logic programming (CLP) approach to the problem is presented. A CLP model of the problem that allows modeling and solving more realistic cases is presented, and the results and the analysis of the solutions are outlined
  • Keywords
    computer aided production planning; electronic engineering computing; electroplating; hoists; logic programming; printed circuit manufacture; scheduling; PCB; constraint logic programming; hoist scheduling problem; optimal cyclic sequence; printed circuit board electroplating; Automatic control; Chemical products; Collaboration; Job shop scheduling; Logic programming; Printed circuits; Production facilities; Rails; Roentgenium; Routing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1992. Proceedings., 1992 IEEE International Conference on
  • Conference_Location
    Nice
  • Print_ISBN
    0-8186-2720-4
  • Type

    conf

  • DOI
    10.1109/ROBOT.1992.220195
  • Filename
    220195