DocumentCode :
3181492
Title :
Optimization of uncertain construction time-cost trade off problem using simulated annealing algorithm
Author :
Suliman, Manal Osman ; Kumar, Vellanki S S ; Abdulal, Wael
Author_Institution :
SE Dept., Osmania Univ., Hyderabad, India
fYear :
2011
fDate :
11-14 Dec. 2011
Firstpage :
489
Lastpage :
494
Abstract :
The problem of time-cost trade off analysis (TCT) is a well-known standard problem in construction management world and it is one of the most important aspects of construction project planning and control. There are tradeoff between time and cost to complete the activities of a project; in general, the less expensive the resources used, the longer it takes to complete an activity. This problem represents a challenging task because the activity duration and cost have uncertainty associated with them, which should be considered when performing schedule optimization. This paper proposes a hybrid technique that combines simulated annealing algorithms (SA) with fuzzy logic to solve construction project time-cost trade-off problem under uncertainty. Fuzzy set theory is applied to model the managers´ behavior in predicting time and cost pertinent to a specific option within an activity. SA is used as a searching mechanism to establish the optimal time-cost profiles under different risk levels. A simple case study is used for testing the proposed approach. In comparison with the previous models, the new model provides managers with greater flexibility to analyze their decisions in a more realistic manner. The results also indicate that SA is able to generate solutions with high quality make it suitable for solving trade off optimization problems in the construction management field.
Keywords :
civil engineering; construction; costing; fuzzy logic; fuzzy set theory; planning; project management; risk management; scheduling; simulated annealing; activity duration; construction management; construction project control; construction project planning; fuzzy logic; fuzzy set theory; manager behavior modeling; optimal time-cost profile; risk level; schedule optimization; searching mechanism; simulated annealing algorithm; time-cost trade off analysis; uncertain construction time-cost trade off problem; Algorithm design and analysis; Computer crashes; Fuzzy sets; Schedules; Simulated annealing; Uncertainty; fuzzy set; project duration; project total cost; simulated annealing; time -cost trade off problem;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information and Communication Technologies (WICT), 2011 World Congress on
Conference_Location :
Mumbai
Print_ISBN :
978-1-4673-0127-5
Type :
conf
DOI :
10.1109/WICT.2011.6141294
Filename :
6141294
Link To Document :
بازگشت