DocumentCode
3182816
Title
Workflow and cooperative problem solving in civil infrastructure management
Author
Jones, P.M. ; Contractor, N.S. ; O´Keefe, B.J. ; Lu, S.C.-Y. ; Case, M. ; Lawrence, P. ; Grobler, F.
Author_Institution
Dept. of Mech. & Ind. Eng., Illinois Univ., Urbana, IL, USA
Volume
5
fYear
1995
fDate
22-25 Oct 1995
Firstpage
4575
Abstract
The goals of Project CITY (Civil Infostructure TechnologY) are to provide a technology demonstration of information infrastructure for civil infrastructure management and to demonstrate the Team Engineering Analysis and Modeling (TEAM) methodology in the analysis, design, and evaluation of that information infrastructure. The community of practice of Project CITY is the Public Works Division at a major Army installation. This paper focuses on three concurrent aspects of the project: 1) Task analyses and knowledge requirements of the community; 2) Systematic surveys of the community with respect to interdependence, workflow, coordination, and technology use; and 3) Candidate technologies for coordination and information sharing in distributed systems (e.g., SWIFT, ACE, and ISAM)
Keywords
distributed decision making; structural engineering; ACE; ISAM; Project CITY; Public Works Division; SWIFT; Team Engineering Analysis and Modeling methodology; civil infrastructure management; community; cooperative problem solving; coordination; distributed systems; information sharing; interdependence; knowledge requirements; task analyses; technology use; workflow; Cities and towns; Costs; Design engineering; Engineering management; Industrial engineering; Information analysis; Laboratories; Oral communication; Problem-solving; Professional communication;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man and Cybernetics, 1995. Intelligent Systems for the 21st Century., IEEE International Conference on
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-2559-1
Type
conf
DOI
10.1109/ICSMC.1995.538516
Filename
538516
Link To Document