• DocumentCode
    3183624
  • Title

    Use of Faulted Phase Earthing using a custom built earth fault controller

  • Author

    McDonagh, N. ; Phang, W.

  • fYear
    2010
  • fDate
    March 29 2010-April 1 2010
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    In order to reduce customer hours lost (CHL) and customer interruptions (CI), the use of Faulted Phase Earthing (FPE) is being considered on the Irish 20 kV distribution system. The operation of this particular FPE system is enabled by the use of a custom built Earth Fault Controller (EFC) that has the ability to detect high impedance faults of up to 12 k??. The EFC can also successfully identify single pole switching events, which have at times caused the mal-operation of existing protection. FPE involves the earthing of a faulted phase during a single line to ground fault. This ensures that the fault site is made safer and that no customers are interrupted during the fault.
  • Keywords
    earthing; fault location; power system protection; custom built; customer hours lost; customer interruptions; earth fault controller; faulted phase earthing; Continuity of Supply; Earth Fault Controller; Faulted Phase Earthing; High Impedance Fault;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Developments in Power System Protection (DPSP 2010). Managing the Change, 10th IET International Conference on
  • Conference_Location
    Manchester
  • Type

    conf

  • DOI
    10.1049/cp.2010.0239
  • Filename
    5522145