DocumentCode
3190576
Title
Optimizing the cost of the telecommunication system
Author
Patel, Raoji R.
Author_Institution
AT&T Network Software Center, Lisle, IL, USA
fYear
1989
fDate
25-27 Sep 1989
Abstract
Over the past three years, a group of professionals at the AT&T Network Software Center have developed and implemented many technical and management procedures. They have made significant contributions to the profitability of the AT&T Network Systems Equipment Division (NSED) during their short tenure. The success of component management, through which much saving is effected, has been accomplished through the following three product realization processes: (1) product review team (PRT), which focuses on activities dealing with product modeling and content analysis; (2) cost management engineering (CME), which encompasses a cradle-to-grave viewpoint of all critical design decisions, along with a product development cycle; and (3) component utilization committee, which brings prime focus on all aspects of the component cost reductions
Keywords
economics; telecommunication network management; telecommunication systems; Network Systems Equipment Division; component management; component utilization committee; content analysis; cost management engineering; product development cycle; product modeling; product review team; profitability; telecommunication system; Content management; Cost function; Design engineering; Electronic components; Engineering management; Manufacturing; Product development; Profitability; Software development management; Switches;
fLanguage
English
Publisher
ieee
Conference_Titel
Electronic Manufacturing Technology Symposium, 1989, Proceedings. Seventh IEEE/CHMT International
Conference_Location
San Francisco, CA
Type
conf
DOI
10.1109/EMTS.1989.68960
Filename
68960
Link To Document