Title :
Dynamic monitoring of mine hoist braking system based on PLCs
Author :
Wang, Qian ; Xiao, Xing-ming ; Ma, Chi ; Xing, Xiao-fang
Author_Institution :
Sch. of Mech. & Electr. Eng., China Univ. of Min. & Technol., Xuzhou, China
Abstract :
In order to ensure the reliability and security of the mine hoist, the typical fault mechanism of braking system is analyzed by establishing brake performance analysis models. The fault analysis tree is constructed by the theory of Fussell-Vesely and the method of how to monitor fault parameters is discussed. The industrial test results indicate that some malfunction, such as lack of braking effort, failure of disc spring and block of hydraulic cylinder can be found by the run parameters of brake. Finally, the equipment is developed using the PLCs, which makes dynamic monitoring of hoist braking system come true.
Keywords :
brakes; fault trees; hoists; mining equipment; programmable controllers; security; springs (mechanical); Fussell-Vesely theory; PLC; brake performance analysis model; braking effort; disc spring failure; dynamic monitoring; fault analysis tree; fault mechanism; fault parameter monitoring; hydraulic cylinder; mine hoist braking system; mine hoist reliability; mine hoist security; Automation; Conferences; Control systems; Intelligent systems; Dynamic Monitoring; Fault Tree Analysis; Mine Hoist Braking system;
Conference_Titel :
Cyber Technology in Automation, Control, and Intelligent Systems (CYBER), 2011 IEEE International Conference on
Conference_Location :
Kunming
Print_ISBN :
978-1-61284-910-2
DOI :
10.1109/CYBER.2011.6011778