DocumentCode
3194872
Title
DA φ NE Operation and Plans for DA φ NE2
Author
Zobov, M. ; Alesini, D. ; Benedetti, G. ; Biagini, M.E. ; Biscari, C. ; Boni, R. ; Boscolo, M. ; Clozza, A. ; Monache, G.D. ; G.di Pirro ; Drago, A. ; Gallo, A. ; Ghigo, A. ; Guiducci, S. ; Incurvati, M. ; Ligi, C. ; Marcellini, F. ; Mazzitelli, G. ; Mila
Author_Institution
LNF-INFN, Frascati, Italy
fYear
2005
fDate
16-20 May 2005
Firstpage
112
Lastpage
116
Abstract
The e+e- collider DAΦNE, a 1.02 GeV c.m. Φ-factory, has reached a peak luminosity of about 1.4×1032cm-2s-1and a peak integrated luminosity in one day of about 8.6 pb-1. With the current rates the physics program of the three main experiments DEAR, FINUDA and KLOE will be completed by the end of 2007. In this paper we describe in detail the steps which have led to the luminosity improvement and the options for the upgrade of the collider towards higher energy and/or luminosity.
Keywords
Apertures; Lattices; Nonlinear optics; Optical feedback; Particle beams; Physics; Predictive models; Stimulated emission; Strontium; Undulators;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Conference_Location
Knoxville, TN, USA
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1590375
Filename
1590375
Link To Document