DocumentCode
3194992
Title
BEPCII-The Second Phase Construction of Beijing Electron Positron Collider
Author
Zhang, C. ; Pei, G.X.
Author_Institution
BEPCII Team, IHEP, CAS, P.O. Box 918, Beijing 100039, P.R. China
fYear
2005
fDate
16-20 May 2005
Firstpage
131
Lastpage
135
Abstract
BEPCII, the second phase construction of the Beijing Electron Positron Collider (BEPC), is a double ring machine with a design luminosity of 1×1033cm-2s-1at 1.89GeV, two orders of magnitude higher than present BEPC. The construction was started in the beginning of 2004 and is scheduled to be completed by the end of 2007. The upgrading of the collider should also provide an improved SR performance with higher beam energy and intensity. The beam currents will be increased to 250mA at E=2.5GeV for the dedicated synchrotron radiation operation. Some key technologies, such as superconducting RF cavity, superconducting micro-beta quadrupole and low impedance vacuum devices etc., are being developed in order to achieve the target of the BEPCII.
Keywords
Colliding beam devices; Electrons; Impedance; Linear particle accelerator; Positrons; Radio frequency; Storage rings; Structural beams; Superconducting magnets; Synchrotron radiation;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1590381
Filename
1590381
Link To Document