• DocumentCode
    3194992
  • Title

    BEPCII-The Second Phase Construction of Beijing Electron Positron Collider

  • Author

    Zhang, C. ; Pei, G.X.

  • Author_Institution
    BEPCII Team, IHEP, CAS, P.O. Box 918, Beijing 100039, P.R. China
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    131
  • Lastpage
    135
  • Abstract
    BEPCII, the second phase construction of the Beijing Electron Positron Collider (BEPC), is a double ring machine with a design luminosity of 1×1033cm-2s-1at 1.89GeV, two orders of magnitude higher than present BEPC. The construction was started in the beginning of 2004 and is scheduled to be completed by the end of 2007. The upgrading of the collider should also provide an improved SR performance with higher beam energy and intensity. The beam currents will be increased to 250mA at E=2.5GeV for the dedicated synchrotron radiation operation. Some key technologies, such as superconducting RF cavity, superconducting micro-beta quadrupole and low impedance vacuum devices etc., are being developed in order to achieve the target of the BEPCII.
  • Keywords
    Colliding beam devices; Electrons; Impedance; Linear particle accelerator; Positrons; Radio frequency; Storage rings; Structural beams; Superconducting magnets; Synchrotron radiation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1590381
  • Filename
    1590381