Title :
PEP-II and KEKB Operational Status
Author_Institution :
Stanford Linear Accelerator Center, Menlo Park, CA 94025, seeman@slac.stanford.edu
Abstract :
The present two B-Factories, PEP-II at SLAC in California and KEKB at KEK in Tsukuba, Japan, operate at the Upsilon 4S and have reached parameter levels unprecedented for e+e- colliders. They have provided very large data samples for their respective particle detectors, BaBar and BELLE. Luminosity has exceeded 1.5 x 1034/cm2/s. Beam currents have reached 2.5 A with 1600 positron bunches spaced by 4 nsec. Continuous injection with the detectors taking data has added significantly to data collection rates by about 40%. Bunch-by-bunch feedback systems damp strong longitudinal and transverse coupled bunch instabilities. The beam-beam interaction has allowed high tune shift levels even in the presence of parasitic crossing and crossing angle effects. Both B-Factory colliders have significant near term luminosity improvement programs.
Keywords :
Boosting; Clouds; Detectors; Electron accelerators; Electron beams; Klystrons; Linear accelerators; Physics; Positrons; Radio frequency;
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
DOI :
10.1109/PAC.2005.1590413