DocumentCode :
3196036
Title :
CEBAF Control Room Renovation
Author :
Spata, M. ; Oren, T. ; Cuffe, A. ; Fanning, H.
Author_Institution :
Jefferson Lab, Newport News, VA 23606, USA
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
378
Lastpage :
381
Abstract :
The Machine Control Center (MCC) at Jefferson Lab´s Continuous Electron Beam Accelerator Facility (CEBAF) was initially constructed in the early 1990s and based on proven technology of that era. Through our experience over the last 15 years and in our planning for the facility’s 12 GeV upgrade we reevaluated the control room environment to capitalize on emerging visualization and display technologies and improve workflow processes and ergonomic attributes. This effort also sets the foundation for the redevelopment of the accelerator´s control system to deliver high reliability performance with improvements in beam specifications management and information flow. The complete renovation was performed over a three-week maintenance period with no interruption to beam operations. We present the results of this effort.
Keywords :
Acceleration; Control systems; Displays; Electron accelerators; Electron beams; Ergonomics; Machine control; Process planning; Technology planning; Visualization;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1590440
Filename :
1590440
Link To Document :
بازگشت