DocumentCode
3196584
Title
BEPCII Interaction Region Design and Construction Status
Author
Wu, Y.Z. ; Yu, C.H. ; Chen, F.S. ; Pang, J.B. ; Zhang, J.F. ; Wang, M.T. ; Peng, Q.L. ; Dai, X.W. ; Yang, Y. ; Yin, Z.S.
Author_Institution
IHEP, Beijing, China
fYear
2005
fDate
16-20 May 2005
Firstpage
478
Lastpage
480
Abstract
BEPC (Beijing Electron Positron Collider) is now upgrading to a double-ring collider which requires a new storage ring to be built in the existing tunnel. A new and compact interaction region (IR) has been designed to allow a peak luminosity of 1033cm-2s-1from an equal beam energy of 1.89 GeV, a crossing angle, 93 bunches with maximum beam current of 0.91 A . The multi-purpose superconducting magnets and conventional dual aperture quadrupoles are used as final focusing quadrupole in the interaction region. The two beams collide at the interaction point with a crossing angle of ± 11 mrad and further beams separation is enhanced with the help of a septum bending magnet which locates just beyond the superconducting magnet and acts on the outgoing beam lines only. This paper will describe the IR design and the construction status.
Keywords
Detectors; Fabrication; Magnetic separation; Particle accelerators; Particle beams; Positrons; Storage rings; Structural beams; Superconducting coils; Superconducting magnets;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1590474
Filename
1590474
Link To Document