• DocumentCode
    3196584
  • Title

    BEPCII Interaction Region Design and Construction Status

  • Author

    Wu, Y.Z. ; Yu, C.H. ; Chen, F.S. ; Pang, J.B. ; Zhang, J.F. ; Wang, M.T. ; Peng, Q.L. ; Dai, X.W. ; Yang, Y. ; Yin, Z.S.

  • Author_Institution
    IHEP, Beijing, China
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    478
  • Lastpage
    480
  • Abstract
    BEPC (Beijing Electron Positron Collider) is now upgrading to a double-ring collider which requires a new storage ring to be built in the existing tunnel. A new and compact interaction region (IR) has been designed to allow a peak luminosity of 1033cm-2s-1from an equal beam energy of 1.89 GeV, a crossing angle, 93 bunches with maximum beam current of 0.91 A . The multi-purpose superconducting magnets and conventional dual aperture quadrupoles are used as final focusing quadrupole in the interaction region. The two beams collide at the interaction point with a crossing angle of ± 11 mrad and further beams separation is enhanced with the help of a septum bending magnet which locates just beyond the superconducting magnet and acts on the outgoing beam lines only. This paper will describe the IR design and the construction status.
  • Keywords
    Detectors; Fabrication; Magnetic separation; Particle accelerators; Particle beams; Positrons; Storage rings; Structural beams; Superconducting coils; Superconducting magnets;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1590474
  • Filename
    1590474