Spear 3 - The First Year of Operation
Author :
Hettel, R.
Author_Institution :
SSRL ASD, SSRL/SLAC, Stanford, CA 94025, U.S.A.
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
505
Lastpage :
509
Abstract :
The first electrons were accumulated in the newly completed 3-GeV SPEAR 3 storage ring on December 15, 2003, five days after the beginning of commissioning. By mid-January of 2004, 100 mA were stored, the maximum current allowed in the first phase of SPEAR 3 operation, and ring characterization and tuning continued until early March when the first photon beam line was opened for users. After the first year of operation the SPEAR 3 beam properties and ring performance had been extensively measured. These include micron stability using slow orbit feedback, an emittance coupling of ∼ 0.1% and 50-h lifetimes. The performance of SPEAR 3 during its first year of commissioning and operation and the improvement plans are described.
Keywords :
Buffer storage; Control systems; Electric variables control; Instruments; Life estimation; Light sources; Power supplies; Process control; Storage rings; System testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1590481
Filename :
1590481
Link To Document :
بازگشت