DocumentCode :
3196877
Title :
Commissioning of Fermilab´s Electron Cooling System for 8-GeV Antiprotons
Author :
Nagaitsev, S. ; Broemmelsiek, D. ; Burov, A. ; Carlson, K. ; Gattuso, C. ; Hu, M. ; Kramper, B. ; Kroc, T. ; Leibfritz, J. ; Prost, L. ; Pruss, S. ; Saewert, G. ; Schmidt, C.W. ; Shemyakin, A. ; Sutherland, M. ; Tupikov, V. ; Warner, A. ; Seletsky, S. ; G
Author_Institution :
FNAL, Batavia, IL 60134, U.S.A., nsergei@fnal.gov
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
540
Lastpage :
543
Abstract :
A 4.3-MeV electron cooling system [1] has been installed at Fermilab in the Recycler antiproton storage ring and is currently being commissioned. The cooling system is designed to assist accumulation of 8.9-GeV/c antiprotons for the Tevatron collider operations. This paper reports on the progress of the electron beam commissioning effort as well as on detailed plans of demonstrating the cooling of antiprotons.
Keywords :
Cooling; Electron beams; Electron emission; Indium phosphide; Particle beams; Prototypes; Stacking; Stochastic processes; Storage rings; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1590489
Filename :
1590489
Link To Document :
بازگشت