Testing, Installation, Commissioning and First Operation of the ISIS RFQ Pre-Injector Upgrade
Author
Letchford, A.P. ; Faircloth, D.C. ; Findlay, D.J.S. ; Perkins, M. ; Stevens, A.F. ; Whitehead, M.O.
Author_Institution
CLRC/Rutherford Appleton Laboratory, Didcot, U.K.
fYear
2005
fDate
16-20 May 2005
Firstpage
695
Lastpage
697
Abstract
Situated at the Rutherford Appleton Laboratory (Oxon., UK), ISIS is currently the world´s most intense pulse spallation neutron source, delivering 160 kW of 800 MeV protons to a tungsten target at 50 Hz. A major facility upgrade programme involves the construction of a second, 10 Hz target and an increase in the total beam power of up to 50% (i.e. up to 240 kW). To achieve the planned increase in average beam current to 300 μA whilst maintaining the current manageable levels of beam loss, four 2nd harmonic RF cavities have been installed in the synchrotron and the ageing Cockcroft-Walton preinjector in the linac has been replaced with a 665 keV, 202.5 MHz, 4-rod Radio Frequency Quadrupole (RFQ). This paper describes the extensive testing, installation, commissioning and successful initial operation of the RFQ pre-injector upgrade.
Keywords
Intersymbol interference; Laboratories; Neutrons; Particle beams; Protons; Radio frequency; Radio spectrum management; Structural beams; Testing; Tungsten;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1590531
Filename
1590531
Link To Document