• DocumentCode
    3198799
  • Title

    Scheduling jobs on a k-stage flexible flow shop using a TOC-based (bottleneck) procedure

  • Author

    Acero-Domínguez, Milton J. ; Paternina-Arboleda, Carlos D.

  • Author_Institution
    Dept. de Ingenieria Ind., Univ. del Norte, Barranquilla
  • fYear
    2004
  • fDate
    16-16 April 2004
  • Firstpage
    295
  • Lastpage
    298
  • Abstract
    We consider the problem of makespan minimization on a flexible flow shop with k stages and ms machines at any stage. We propose a heuristic algorithm based on the identification and exploitation of the bottleneck stage, which is simple to use and to understand by practitioners. A computational experiment is conducted to evaluate the performance of the proposed method. The study shows that our method is, in average, comparable with other bottleneck-based algorithms, but with smaller variance, and that it requires less computational effort
  • Keywords
    flow shop scheduling; job shop scheduling; minimisation; TOC-based procedure; bottleneck-based algorithms; computational experiment; constraint theory; flexible flow shop; heuristic algorithm; job scheduling; makespan minimization; Approximation algorithms; Concurrent computing; Flexible manufacturing systems; Genetic algorithms; Heuristic algorithms; Integrated circuit packaging; Job shop scheduling; Mathematical programming; Processor scheduling; System performance;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems and Information Engineering Design Symposium, 2004. Proceedings of the 2004 IEEE
  • Conference_Location
    Charlottesville, VA
  • Print_ISBN
    0-9744559-2-X
  • Type

    conf

  • DOI
    10.1109/SIEDS.2004.239977
  • Filename
    1314694