DocumentCode :
3200454
Title :
High heat flux test with HIP bonded Be/Cu mock-ups for the ITER first wall
Author :
Lee, Dong Won ; Park, Jeong Yong ; Kim, Suk Kwon ; Jung, Hyun Kyu ; Bae, Young Dug ; Choi, Byung Kwon ; Jeong, Yong Hwan ; Hong, Bong Guen
Author_Institution :
Korea Atomic Energy Res. Inst., Daejeon, South Korea
fYear :
2009
fDate :
1-5 June 2009
Firstpage :
1
Lastpage :
4
Abstract :
In order to verify the integrity of the first wall (FW) of the International Thermonuclear Experimental Reactor (ITER), Be/Cu mock-ups were fabricated and tested at the KoHLT-1 (Korea Heat Load Test facility), an graphite heater facility, in KAERI, Republic of Korea. These mock-ups were joined with CuCrZr for a heat sink material and three Be tiles for an armor material. There is no Stainless Steel structure and tubes differently from the original ITER blanket FW. A Hot Isostatic Pressing (HIP) was used as manufacturing methods at a 580degC and 100 MPa for 2 hours for a Be/Cu joining. Three kinds of mock-ups were fabricated by using 1 mum Cr/10 mum Cu, 1 mum Ti/0.5 mum Cr/10 mum Cu, and 5 mum Ti/10 mumCu of interlayers between the Be tile and Cu block. The high heat flux (HHF) tests were performed at 1.0 MW/m2 heat flux for each mock-up. The given conditions and the expected fatigue lifetime were evaluated from a preliminary analysis with ANSYS. All mock-ups survived for up to 1000 cycles except two mock-ups, in which Be tiles were detached by discharge during the test after 862 cycles. This results prove the integrity of the HIP conditions including interlayers, and more, show the stable and long operation of our facility, KoHLT-1.
Keywords :
Tokamak devices; fatigue; fusion reactor blankets; hot pressing; nuclear engineering computing; ANSYS; Be-CuCrZr-FeCrCJk; HIP bonded mock-ups; ITER blanket first wall; International Thermonuclear Experimental Reactor; KAERI; KoHLT-1; fatigue lifetime; graphite heater facility; heat sink material; high heat flux test; hot isostatic pressing; Bonding; Chromium; Heat sinks; Hip; Inductors; Joining materials; Steel; Test facilities; Testing; Tiles; Be/Cu/SS mock-up; First Wall; HHF test; HIP; ITER; Qualification test;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Fusion Engineering, 2009. SOFE 2009. 23rd IEEE/NPSS Symposium on
Conference_Location :
San Diego, CA
Print_ISBN :
978-1-4244-2635-5
Electronic_ISBN :
978-1-4244-2636-2
Type :
conf
DOI :
10.1109/FUSION.2009.5226443
Filename :
5226443
Link To Document :
بازگشت