DocumentCode
3202785
Title
Spallation Neutron Source Ring - Design and Construction Summary
Author
Jie Wei
Author_Institution
Spallation Neutron Source Collaboration, USA, jwei@bnl.gov
fYear
2005
fDate
16-20 May 2005
Firstpage
1499
Lastpage
1501
Abstract
After six years, the delivery of components for the Spallation Neutron Source (SNS) accumulator ring (AR) and the transport lines was completed in Spring 2005. Designed to deliver 1.5 MW beam power (1.5 × 1014protons of 1 GeV kinetic energy at a repetition rate of 60 Hz), stringent measures were implemented in the fabrication, test, and assembly to ensure the quality of the accelerator systems. This paper summarizes the design, R&D, and construction of the ring and transport systems.
Keywords
Energy measurement; Fabrication; Kinetic energy; Neutrons; Particle beam measurements; Particle beams; Power measurement; Protons; Springs; Structural beams;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Conference_Location
Knoxville, TN, USA
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1590813
Filename
1590813
Link To Document