• DocumentCode
    3203998
  • Title

    30 GHz Power Production in CTF3

  • Author

    Achard, C. ; Braun, H.H. ; Carron, G. ; Corsini, R. ; Grudiev, A. ; Heikkinen, S. ; Schulte, D. ; Sladen, J. ; Syratchev, I. ; Tecker, F. ; Wilson, I. ; Wuensch, W.

  • Author_Institution
    CERN, Geneva, Switzerland
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    1695
  • Lastpage
    1697
  • Abstract
    One of the major objectives of CTF3 (CLIC Test Facility) is the production of 30 GHz power for the high-gradient testing of CLIC accelerating structures. To this end a dedicated beam line, power generating structure and power transfer line have been designed, installed and commissioned. 52 MW of 30 GHz power with a pulse length of 74 ns and a repetition rate of 16 Hz were delivered to the high-gradient test area. This will allow operation of test accelerating structures in the first CTF3 run of 2005 up to the nominal CLIC accelerating gradient of 150 MV/m and beyond the nominal pulse length. The system is described and the performances of the CTF3 linac, beam line and the rf components are reviewed.
  • Keywords
    Apertures; Frequency; Geometry; Life estimation; Linear particle accelerator; Positron emission tomography; Power generation; Production; Test facilities; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1590881
  • Filename
    1590881