• DocumentCode
    3205981
  • Title

    RHIC BPM System Modifications and Performance

  • Author

    Satogata, T. ; Calaga, R. ; Cameron, P. ; Cerniglia, P. ; Cupolo, J. ; Curcio, A. ; Dawson, W.C. ; Degen, C. ; Gullotta, J. ; Mead, J. ; Michnoff, R. ; Russo, T. ; Sikora, R.

  • Author_Institution
    Brookhaven National Laboratory, Upton, NY 11973– 5000, USA, email satogata@bnl.gov
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    2021
  • Lastpage
    2023
  • Abstract
    The RHIC beam position monitor (BPM) system provides independent average orbit and turn-by-turn (TBT) position measurements. In each ring, there are 162 measurement locations per plane (horizontal and vertical) for a total of 648 BPM planes in the RHIC machine. During 2003 and 2004 shutdowns, BPM processing electronics were moved from the RHIC tunnel to controls alcoves to reduce radiation impact, and the analog signal paths of several dozen modules were modified to eliminate gainswitching relays and improve signal stability. This paper presents results of improved system performance, including stability for interaction region beam-based alignment efforts. We also summarize performance of recently-added DSP profile scan capability, and improved million-turn TBT acquisition channels for 10 Hz triplet vibration, nonlinear dynamics, and echo studies.
  • Keywords
    Digital signal processing; Extraterrestrial measurements; Firewire; Gain measurement; Histograms; Laboratories; Monitoring; Position measurement; Signal processing; Stability;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1590995
  • Filename
    1590995