DocumentCode
3205981
Title
RHIC BPM System Modifications and Performance
Author
Satogata, T. ; Calaga, R. ; Cameron, P. ; Cerniglia, P. ; Cupolo, J. ; Curcio, A. ; Dawson, W.C. ; Degen, C. ; Gullotta, J. ; Mead, J. ; Michnoff, R. ; Russo, T. ; Sikora, R.
Author_Institution
Brookhaven National Laboratory, Upton, NY 11973– 5000, USA, email satogata@bnl.gov
fYear
2005
fDate
16-20 May 2005
Firstpage
2021
Lastpage
2023
Abstract
The RHIC beam position monitor (BPM) system provides independent average orbit and turn-by-turn (TBT) position measurements. In each ring, there are 162 measurement locations per plane (horizontal and vertical) for a total of 648 BPM planes in the RHIC machine. During 2003 and 2004 shutdowns, BPM processing electronics were moved from the RHIC tunnel to controls alcoves to reduce radiation impact, and the analog signal paths of several dozen modules were modified to eliminate gainswitching relays and improve signal stability. This paper presents results of improved system performance, including stability for interaction region beam-based alignment efforts. We also summarize performance of recently-added DSP profile scan capability, and improved million-turn TBT acquisition channels for 10 Hz triplet vibration, nonlinear dynamics, and echo studies.
Keywords
Digital signal processing; Extraterrestrial measurements; Firewire; Gain measurement; Histograms; Laboratories; Monitoring; Position measurement; Signal processing; Stability;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1590995
Filename
1590995
Link To Document