• DocumentCode
    3206359
  • Title

    Fabrication of the Prototype 201.25 MHz Cavity for a Muon Ionization Cooling Experiment

  • Author

    Rimmer, R.A. ; Manning, S. ; Manus, R. ; Phillips, L. ; Stirbet, M. ; Worland, K. ; Wu, G. ; Li, D. ; MacGill, R. ; Staples, J. ; Virostek, S. ; Zisman, M. ; Taminger, K. ; Hafley, R. ; Martin, R. ; Summers, D. ; Reep, M.

  • Author_Institution
    JLab
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    2080
  • Lastpage
    2082
  • Abstract
    We describe the fabrication and assembly of the first prototype 201.25 MHz copper cavity for the muon ionization cooling experiment (MICE). This cavity was developed by the US MUCOOL collaboration and will be tested in the new MUCOOL Test Area at Fermilab. We outline the component and subassembly fabrication steps and the various metal forming and joining methods used to produce the final cavity shape. These include spinning, brazing, TIG welding, electron beam welding, electron beam annealing and deep drawing. Some of the methods developed for this cavity are novel and offer significant cost savings over conventional construction methods.
  • Keywords
    Assembly; Cooling; Copper; Electron beams; Fabrication; Ionization; Mesons; Prototypes; Testing; Welding;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1591015
  • Filename
    1591015