DocumentCode
3206359
Title
Fabrication of the Prototype 201.25 MHz Cavity for a Muon Ionization Cooling Experiment
Author
Rimmer, R.A. ; Manning, S. ; Manus, R. ; Phillips, L. ; Stirbet, M. ; Worland, K. ; Wu, G. ; Li, D. ; MacGill, R. ; Staples, J. ; Virostek, S. ; Zisman, M. ; Taminger, K. ; Hafley, R. ; Martin, R. ; Summers, D. ; Reep, M.
Author_Institution
JLab
fYear
2005
fDate
16-20 May 2005
Firstpage
2080
Lastpage
2082
Abstract
We describe the fabrication and assembly of the first prototype 201.25 MHz copper cavity for the muon ionization cooling experiment (MICE). This cavity was developed by the US MUCOOL collaboration and will be tested in the new MUCOOL Test Area at Fermilab. We outline the component and subassembly fabrication steps and the various metal forming and joining methods used to produce the final cavity shape. These include spinning, brazing, TIG welding, electron beam welding, electron beam annealing and deep drawing. Some of the methods developed for this cavity are novel and offer significant cost savings over conventional construction methods.
Keywords
Assembly; Cooling; Copper; Electron beams; Fabrication; Ionization; Mesons; Prototypes; Testing; Welding;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1591015
Filename
1591015
Link To Document