Progress Report on the Construction of SOLEIL
Author :
Level, M.P. ; Loulergue, A. ; Filhol, J.-M. ; Besson, J.C. ; Brunelle, P. ; Chaput, R. ; Daël, A. ; Nadji, A. ; Denard, J.C. ; Godefroy, J.-M. ; Herbeaux, C. ; Marchand, P. ; Nadolski, L. ; Nagaoka, R. ; Tordeux, M.-A. ; Le Roux, V.
Author_Institution :
Synchrotron SOLEIL, L’orme des Merisiers, SAINT-AUBIN - BP 38, F-91192 GIF sur Yvette CEDEX, FRANCE
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
2203
Lastpage :
2205
Abstract :
SOLEIL is a 2.75 GeV third generation synchrotron radiation facility under construction near Paris. The construction is going towards its completion. The commissionings of the LINAC and of the first transfer line are starting, the booster is already installed in the tunnel and the tests of the equipments are under way, the installation of the storage ring is just beginning. This paper presents the status of the main storage ring equipments: magnets, power supplies, vacuum system, diagnostics, RF system, front ends and insertion devices.
Keywords :
Linear particle accelerator; Magnetic separation; Magnets; Power supplies; Radio frequency; Reproducibility of results; Saturation magnetization; Storage rings; Synchrotron radiation; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1591057
Filename :
1591057
Link To Document :
بازگشت