• DocumentCode
    320856
  • Title

    Implementing NEPOOL´s restructuring proposal: the installed capacity market

  • Author

    Fedora, Philip A. ; Kazin, Craig A.

  • Author_Institution
    ISO-New England Inc., Holyoke, MA, USA
  • Volume
    3
  • fYear
    1998
  • fDate
    1998
  • Firstpage
    132
  • Abstract
    The paper summarizes the installed capacity market as proposed by recent amendments to the New England Power Pool (NEPOOL) Agreement and describes the resulting changes required in NEPOOL´s settlement infrastructure. The market´s bidding specifics are expected to be finalized by the NEPOOL participants in 1997. Once finalized, appropriate procedures will be incorporated into the settlement processes administered by the Independent System Operator (ISO). The target date for implementation of the installed capacity market is November 1, 1997; the interim energy markers are expected to follow and become operational in April, 1998. Andersen Consulting has been retained by NEPOOL to assist in the development of a transition plan, schedule and resource requirements to meet these target dates
  • Keywords
    electricity supply industry; power system planning; scheduling; Andersen Consulting; Independent System Operator; NEPOOL restructuring proposal; NEPOOL settlement infrastructure; New England Power Pool Agreement; energy markers; installed capacity market; market bidding; resource requirements; transition plan; transition schedule; Automatic generation control; Bylaws; Control systems; Costs; Ethics; Flexible printed circuits; ISO; Power markets; Proposals; Scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    System Sciences, 1998., Proceedings of the Thirty-First Hawaii International Conference on
  • Conference_Location
    Kohala Coast, HI
  • Print_ISBN
    0-8186-8255-8
  • Type

    conf

  • DOI
    10.1109/HICSS.1998.656083
  • Filename
    656083