Installation and Testing for Commissioning of Normal Conducting RF Linac Segment in the SNS
Author :
Kang, Y. ; Aleksandrov, A. ; Anderson, D. ; Champion, M.M. ; Champion, M.S. ; Crofford, M. ; Deibele, C. ; Dodson, G. ; Fuja, R. ; Gibson, P. ; Gurd, P. ; Hardek, T. ; Johnson, G. ; Ladd, P. ; Ma, H. ; McCarthy, M. ; Piller, M. ; Tang, J. ; Vassioutchenko
Author_Institution :
ORNL, TN, USA
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
2571
Lastpage :
2573
Abstract :
The Spallation Neutron Source (SNS) linac will deliver a 1.0 GeV proton beam to its accumulator ring. The normal conducting segment of the linac has a radio frequency quadrupole (RFQ), six drift tube linac (DTL) tanks powered by seven 402.5 MHz klystrons and four coupled cavity linac (CCL) modules powered by four 805 MHz klystrons that deliver the 180 MeV beam to the superconducting section of the linac (SCL) that employs eighty one 6-cell cavities powered by eighty-one 805 MHz klystrons. The normal conducting accelerating linac segment has been completely installed in the linac tunnel and successfully conditioned and commissioned. Corresponding high voltage converter modulator (HVCM) and low level RF (LLRF) control systems have been installed and tested.
Keywords :
Acceleration; Klystrons; Linear particle accelerator; Neutrons; Optical coupling; Particle beams; Radio frequency; Superconducting devices; Testing; Voltage control;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1591186
Filename :
1591186
Link To Document :
بازگشت