    Rf Tuning and Fabrication Status of the First Module for J-PARC ACS

  • Author

    Ao, H. ; Morishita, T. ; Ueno, A. ; Hasegawa, K. ; Yamazaki, Y. ; Ikegami, M. ; Varamonov, V.

  • Author_Institution
    JAERI, Ibaraki, Japan, aohi@linac.tokai.jaeri.go.jp
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    2684
  • Lastpage
    2686
  • Abstract
    J-PARC Linac starts with 180-MeV SDTL temporary, and it is upgraded to 400-MeV with 21 ACS (Annular Coupled Structure) modules and two ACS bunchers and two debunchers [1]. First buncher module is under fabrication, and second buncher and a few accelerating modules are also planed until FY2006. The first ACS module consists of two 5-cells ACS tanks and a 5-cells bridge cavity for the buncher module. Three RF tuners are installed to the bridge cavity for fine RF tuning. An operating frequency should be tuned to 972 MHz within the fine-tuning range before a brazing process in a factory. The tuning procedure has been studied with RF simulation analysis and cold-model measurements for ACS and bridge cells [2]. This paper describes RF tuning results, fabrication status and related development items.
  • Keywords
    Acceleration; Bridges; Fabrication; Frequency measurement; Linear particle accelerator; Machining; Particle beams; Production facilities; Radio frequency; Tuning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1591228
  • Filename
    1591228