• DocumentCode
    3210220
  • Title

    Production planning for a prone to failures manufacturing facility with stochastic demand

  • Author

    Eleftheriu, M.N. ; Desrochers, A.A.

  • Author_Institution
    Dept. of Electr. Comput. & Syst. Eng., Rensselaer Polytech. Inst., Troy, NY, USA
  • fYear
    1988
  • fDate
    23-25 May 1988
  • Firstpage
    74
  • Lastpage
    80
  • Abstract
    The production planning of a manufacturing facility with uncertain capacity and stochastic demand is discussed. The plan is based on the hedging point policy as derived by S.B. Gershwin et al. (1985). The same policy is applied for a system that has stochastic demand and is prone to failures. The same policy can also be used to determine the size of the buffer for a system with two machines. Simulation is used to evaluate the method, since there is no analytic proof of optimality
  • Keywords
    production control; scheduling; stochastic systems; hedging point policy; production planning; prone to failures manufacturing facility; stochastic demand; uncertain capacity; Capacity planning; Computer aided manufacturing; Markov processes; Modeling; Production facilities; Production planning; Production systems; Stochastic processes; Stochastic systems; Systems engineering and theory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Integrated Manufacturing, 1988., International Conference on
  • Conference_Location
    Troy, NY
  • Print_ISBN
    0-8186-0888-9
  • Type

    conf

  • DOI
    10.1109/CIM.1988.5393
  • Filename
    5393