DocumentCode :
3210952
Title :
Developments of the Calibation Tools for Beam Position Monitor at J-PARC Linac
Author :
Sato, S. ; Tomisawa, T. ; Akikawa, H. ; Ueno, A. ; Lee, S. ; Igarashi, Z. ; Ikegami, M. ; Toyama, T. ; Kamikubota, N.
Author_Institution :
JAERI, Ibaraki, 319-1195 Japan; susumu.sato@j-parc.jp
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
2777
Lastpage :
2779
Abstract :
In the J-PARC LINAC, there are mainly two requirements for calibration of beam position monitors (BPMs). One is that BPMs need to be calibrated with the accuracy of less than about a hundred micrometers to minimize beam loss for the world highest class of proton intensity. The other is that about a hundred of BPMs need to be calibrated and maintained consistently. To achieve these requirements, the calibration tools are being developed. During development, experiences on real beam in a MEBT line set for the DTL commissioning are utilized. The status of the development of calibration tools is described in this paper.
Keywords :
Azimuth; Calibration; Ducts; Linear particle accelerator; Magnets; Monitoring; Shape; Stripline; Structural beams; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1591264
Filename :
1591264
Link To Document :
بازگشت