Title :
An Alignment of J-PARC Linac
Author :
Morishita, T. ; Ao, H. ; Ito, T. ; Ueno, A. ; Hasegawa, K. ; Ikegami, M. ; Kubota, C. ; Naito, F. ; Takasaki, E. ; Tanaka, H. ; Yoshino, K.
Author_Institution :
JAERI, Tokai, Ibaraki 319-1195, Japan, morishita@linac.tokai.jaeri.go.jp
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
2851
Lastpage :
2853
Abstract :
J-PARC linear accelerator components are now being installed in the accelerator tunnel, whose total length is more than 400 m including the beam transport line to 3GeV synchrotron. A precise alignment of accelerator components is essential for high quality beam acceleration. In this paper, planned alignment schemes for the installation of linac components and watching the long term motion of the building are described. Markings are placed on the floor, which act as a reference for the initial alignment at the installation. For a straight line alignment, the wire position sensor is placed on the offset position with respect to the beam center by a target holder. The hydrostatic levering system is used for watching the floor elevation over the long period.
Keywords :
Floors; High level synthesis; Indium tin oxide; Klystrons; Linear accelerators; Linear particle accelerator; Monitoring; Particle beams; Synchrotrons; Wire;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1591291
Filename :
1591291
Link To Document :
بازگشت