DocumentCode :
3212994
Title :
Injector Linac for the BNL Super Neutrino Beam Project
Author :
Raparia, D. ; Alessi, J. ; Ruggiero, A. ; Weng, W.T.
Author_Institution :
BNL, Upton, NY 11973, U.S.A., raparia@bnl.gov
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
3129
Lastpage :
3131
Abstract :
BNL plans to upgrade the AGS proton beam power from the present 0.14 MW to higher than 1.0 MW and beyond for a neutrino facility. We have examined possible upgrade to the AGS accelerator complex that would meet the requirements of the proton beam of 1.0 MW for neutrino superbeam facility. The major contribution for the higher power is from the increase of the repetition rate of the AGS from 0.3 Hz to 2.5 Hz, with moderate increase from the intensity. To increase the AGS repetition rate we are proposing to replace booster with a 1.5 GeV linac. We will replace part of existing 200 MeV linac with coupled cavity structure from 116 MeV to 400 MeV and then add an additional 1.1 GeV superconducting linac to reach a final energy of 1.5 GeV for direct H-injection into the AGS. We will present possible choices for the upgrade and our choice and its design.
Keywords :
Acceleration; Frequency; Linear particle accelerator; Machine components; Neutrino sources; Particle beam injection; Particle beams; Production; Proton accelerators; Space vector pulse width modulation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1591387
Filename :
1591387
Link To Document :
بازگشت