• DocumentCode
    3213975
  • Title

    A job completion time estimation method for work center scheduling

  • Author

    Owens, Thoma A. ; Luh, Peter B.

  • Author_Institution
    Dept. of Electr. & Syst. Eng., Connecticut Univ., Storrs, CT, USA
  • fYear
    1991
  • fDate
    9-11 Apr 1991
  • Firstpage
    110
  • Abstract
    Two related issues in the development of scheduling algorithms are addressed. The first centers on the inability of schedulers to predict when jobs will actually be completed. Existing jobs scheduled without information concerning future arrivals are frequently postponed to make room for incoming jobs of significant urgency. A probabilistic method of considering future arrivals when scheduling a bottleneck work center via the Lagrangian relaxation method is presented. In addition, a method of reducing the scheduling time step is presented. Implementation of a smaller time step allows for more accurate representation of job processing times. Both methods are combined to improve the determination of promised delivery dates
  • Keywords
    probability; production control; relaxation theory; scheduling; Lagrangian relaxation; delivery dates; future arrivals; job completion time estimation; probabilistic method; production control; work center scheduling; Dynamic scheduling; Job shop scheduling; Lagrangian functions; Manufacturing processes; Parallel machines; Processor scheduling; Relaxation methods; Research and development; Scheduling algorithm; Systems engineering and theory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1991. Proceedings., 1991 IEEE International Conference on
  • Conference_Location
    Sacramento, CA
  • Print_ISBN
    0-8186-2163-X
  • Type

    conf

  • DOI
    10.1109/ROBOT.1991.131563
  • Filename
    131563