DocumentCode :
3213975
Title :
A job completion time estimation method for work center scheduling
Author :
Owens, Thoma A. ; Luh, Peter B.
Author_Institution :
Dept. of Electr. & Syst. Eng., Connecticut Univ., Storrs, CT, USA
fYear :
1991
fDate :
9-11 Apr 1991
Firstpage :
110
Abstract :
Two related issues in the development of scheduling algorithms are addressed. The first centers on the inability of schedulers to predict when jobs will actually be completed. Existing jobs scheduled without information concerning future arrivals are frequently postponed to make room for incoming jobs of significant urgency. A probabilistic method of considering future arrivals when scheduling a bottleneck work center via the Lagrangian relaxation method is presented. In addition, a method of reducing the scheduling time step is presented. Implementation of a smaller time step allows for more accurate representation of job processing times. Both methods are combined to improve the determination of promised delivery dates
Keywords :
probability; production control; relaxation theory; scheduling; Lagrangian relaxation; delivery dates; future arrivals; job completion time estimation; probabilistic method; production control; work center scheduling; Dynamic scheduling; Job shop scheduling; Lagrangian functions; Manufacturing processes; Parallel machines; Processor scheduling; Relaxation methods; Research and development; Scheduling algorithm; Systems engineering and theory;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Robotics and Automation, 1991. Proceedings., 1991 IEEE International Conference on
Conference_Location :
Sacramento, CA
Print_ISBN :
0-8186-2163-X
Type :
conf
DOI :
10.1109/ROBOT.1991.131563
Filename :
131563
Link To Document :
بازگشت