DocumentCode :
3215759
Title :
Enhancements of Machine Reliability and Beam Quality in Spring-8 Linac for Top-Up Injection into Two Storage Rings
Author :
Hanaki, H. ; Asaka, T. ; Dewa, H. ; Kobayashi, T. ; Mizuno, A. ; Suzuki, S. ; Taniuchi, T. ; Tomizawa, H. ; Yanagida, K.
Author_Institution :
JASRI/SPring-8, Mikazuki, Sayo, Hyogo 679-5198, Japan
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
3585
Lastpage :
3587
Abstract :
The SPring-8 linac has been improved to realize stable top-up injection into the SPring-8 and the NewSUBARU storage rings. The beam energy instability of 0.02% rms in the long term was achieved by the following stabilizations: RF amplitude and phase stabilization, synchronization of beam timing and linac´s 2856 MHz RF, and the installation of an energy compensation system (ECS). Beam feedback controls compensate for residual long-term variation of beam trajectory and energy. A beam deflector installed between a gun and a prebuncher reduces gun´s dark currents, which spoil the purity of the stored beam in the storage ring.
Keywords :
Dark current; Feedback control; Klystrons; Linear particle accelerator; Radio frequency; Satellites; Stability; Storage rings; Synchrotrons; Temperature;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1591547
Filename :
1591547
Link To Document :
بازگشت