DocumentCode
3216241
Title
Jefferson Lab´s Trim Card II
Author
Allison, T. ; Higgins, S. ; Martin, E. ; Merz, W. ; Philip, S.
Author_Institution
Jefferson Lab, Newport News, VA 23606, U.S.A., allison@jlab.org
fYear
2005
fDate
16-20 May 2005
Firstpage
3670
Lastpage
3672
Abstract
Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) uses Trim Card I power supplies to drive approximately 1900 correction magnets. These trim cards have had a long and illustrious service record. However, some of the employed technology is now obsolete, making it difficult to maintain the system and retain adequate spares. The Trim Card II is being developed to act as a transparent replacement for its aging predecessor. A modular approach has been taken in its development to facilitate the substitution of sections for future improvements and maintenance. The resulting design has been divided into a motherboard and 7 daughter cards which has also allowed for parallel development. The Trim Card II utilizes modern technologies such as a Field Programmable Gate Array (FPGA) and a microprocessor to embed trim card controls and diagnostics. These reprogrammable devices also provide the versatility to incorporate future requirements.
Keywords
Central Processing Unit; Displays; Field programmable gate arrays; Flexible printed circuits; Magnets; Microprocessors; Monitoring; Power amplifiers; Power supplies; Regulators;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Conference_Location
Knoxville, TN, USA
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1591576
Filename
1591576
Link To Document