• DocumentCode
    3216350
  • Title

    PEP-II Large Power Supplies Rebuild Program at SLAC

  • Author

    Bellomo, P. ; Lipari, J.J. ; de Lira, A.C. ; Rafael, F.S.

  • Author_Institution
    SLAC, Menlo Park, CA 94025 USA
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    3685
  • Lastpage
    3687
  • Abstract
    Seven large power supplies (LGPS) with output ratings from 72kW to 270kW power PEP-II quad magnets in the electron-positron collider region. These supplies have posed serious maintenance and reliability problems since they were installed in 1997, resulting in loss of accelerator availability. A redesign/rebuild program was undertaken by the SLAC Power Conversion Department. During the 2004 summer shutdown all the control circuits in these supplies were redesigned and replaced. A new PWM control board, programmable logic controller, and touch panel have been installed to improve LGPS reliability, and to make troubleshooting easier. In this paper we present the details of this rebuilding program and results.
  • Keywords
    Adders; Availability; Circuit testing; Insulated gate bipolar transistors; Magnets; Maintenance; Power supplies; Programmable control; Pulse width modulation; Temperature control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1591581