PEP-II Large Power Supplies Rebuild Program at SLAC
Author :
Bellomo, P. ; Lipari, J.J. ; de Lira, A.C. ; Rafael, F.S.
Author_Institution :
SLAC, Menlo Park, CA 94025 USA
Abstract :
Seven large power supplies (LGPS) with output ratings from 72kW to 270kW power PEP-II quad magnets in the electron-positron collider region. These supplies have posed serious maintenance and reliability problems since they were installed in 1997, resulting in loss of accelerator availability. A redesign/rebuild program was undertaken by the SLAC Power Conversion Department. During the 2004 summer shutdown all the control circuits in these supplies were redesigned and replaced. A new PWM control board, programmable logic controller, and touch panel have been installed to improve LGPS reliability, and to make troubleshooting easier. In this paper we present the details of this rebuilding program and results.
Keywords :
Adders; Availability; Circuit testing; Insulated gate bipolar transistors; Magnets; Maintenance; Power supplies; Programmable control; Pulse width modulation; Temperature control;
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
DOI :
10.1109/PAC.2005.1591581