DocumentCode
3217170
Title
Injector Power Supplies Reliability Improvements at the Advanced Photon Source
Author
Hillman, A. ; Pasky, S. ; Sereno, N. ; Soliday, R. ; Wang, J.
Author_Institution
Argonne National Laboratory, Advanced Photon Source 9700 S. Cass Ave., Argonne, IL 60439, USA. Hillmana@anl.gov
fYear
2005
fDate
16-20 May 2005
Firstpage
3804
Lastpage
3806
Abstract
Operational goals for the Advanced Photon Source (APS) facility include 97% availability and a mean time between unscheduled beam losses (faults) of 70 hours, with more than 5000 user hours of scheduled beam per year. To meet this objective, our focus has been maximizing the mean time between faults (MTBF). We have made various hardware and software improvements to better operate and monitor the injector power supply systems. These improvements have been challenging to design and implement in light of the facility operating requirements but are critical to maintaining maximum reliability and availability of beam for user operations. This paper presents actions taken as well as future plans to continue improving injector power supply hardware and software to meet APS user operation goals.
Keywords
Availability; Hardware; Magnetic separation; Maintenance; Monitoring; Particle beams; Power supplies; Power system reliability; Statistics; Strontium;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1591627
Filename
1591627
Link To Document