DocumentCode :
3217170
Title :
Injector Power Supplies Reliability Improvements at the Advanced Photon Source
Author :
Hillman, A. ; Pasky, S. ; Sereno, N. ; Soliday, R. ; Wang, J.
Author_Institution :
Argonne National Laboratory, Advanced Photon Source 9700 S. Cass Ave., Argonne, IL 60439, USA. Hillmana@anl.gov
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
3804
Lastpage :
3806
Abstract :
Operational goals for the Advanced Photon Source (APS) facility include 97% availability and a mean time between unscheduled beam losses (faults) of 70 hours, with more than 5000 user hours of scheduled beam per year. To meet this objective, our focus has been maximizing the mean time between faults (MTBF). We have made various hardware and software improvements to better operate and monitor the injector power supply systems. These improvements have been challenging to design and implement in light of the facility operating requirements but are critical to maintaining maximum reliability and availability of beam for user operations. This paper presents actions taken as well as future plans to continue improving injector power supply hardware and software to meet APS user operation goals.
Keywords :
Availability; Hardware; Magnetic separation; Maintenance; Monitoring; Particle beams; Power supplies; Power system reliability; Statistics; Strontium;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1591627
Filename :
1591627
Link To Document :
بازگشت