    Installation and Testing of SNS Magnet Power Supplies

  • Author

    Rust, Kenneth R. ; Barnett, William E. ; Cutler, Roy I. ; Weaver, Joey T. ; Lambiase, Robert ; Sandberg, Jon ; Dewan, Shashi ; Holmes, Robert ; Wong, Sam ; Zeng, Jiaqi

  • Author_Institution
    ORNL/SNS, Oak Ridge, Tennessee 37831, U.S.A.
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    3889
  • Lastpage
    3891
  • Abstract
    This paper describes the types and quantities of dc and pulsed magnet power supplies required for the Spallation Neutron Source (SNS) Linear Accelerator: High-Energy Beam Transport (HEBT), Ring and the Ring-to-Target Beam Transfer (RTBT). There are over 600 magnets and more than 550 magnet power supplies. These magnet power supplies range in size from the bipolar corrector supplies rated at 35 volts, 20 amps to the main-ring dipole supply that is rated at 440 volts, 6000 amps. The Linac power supplies have a ripple/stability specification of 1000 parts per million while the ring supplies have a specification of 100 parts per million. There are also pulsed-power supplies for beam injection and beam extraction. The paper will show acceptance test results from the manufacturers as well as test results performed by the SNS magnet power supply group.
  • Keywords
    Linear accelerators; Linear particle accelerator; Neutrons; Particle beams; Performance evaluation; Power supplies; Pulp manufacturing; Pulsed power supplies; Stability; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1591658
  • Filename
    1591658