Abstract :
Summary form only given. Utility Industry is evolving to a new distribution operation paradigm where demand response activity is becoming an integral part. One of the methodologies for measuring distribution operation design correctness has been to analyze how well utility has kept up with reliability performance indices, such as SAIDI (System Average Interruption Duration Index) and SAIFI (System Average Interruption Frequency Index). With the advent of wide variety of demand response (DR) programs, the utility industry needs to re-define the existing approach and practices in distribution grid operation. This paper presents a novel methodology for establishing and evaluating distribution operation goals and execution respectively. The methodology discussion is extended with design models for implementing demand response contracts in real-time distribution operation. In addition, the paper presents critical comments on various differences in modeling approaches for integrated distribution operation together with demand response. Discussion of future distribution grid operational goals will include consideration to emerging business process of electric distribution companies (EDC) and DR service provider companies (DRSPC). The discussion will lead to formulation of objective function of distribution operation optimization from perspectives of EDC and DRSPC. The constraints of the distribution operation optimization will include demand response contract constraints as well as traditional operational targets such as SAIDI and SAIFI either in implicit form or in explicit form.
Keywords :
electricity supply industry; power distribution reliability; power grids; power system management; power system reliability; SAIDI; SAIFI; demand response contracts; demand response programs; distribution grid operation; distribution management system; distribution operation paradigm; operational reliability indices; reliability performance indices; system average interruption duration index; system average interruption frequency index; utility industry; Companies; Constraint optimization; Contracts; Frequency measurement; Load management; Performance analysis; USA Councils;
Conference_Titel :
Power Systems Conference and Exposition, 2009. PSCE '09. IEEE/PES
Conference_Location :
Seattle, WA
Print_ISBN :
978-1-4244-3810-5
Electronic_ISBN :
978-1-4244-3811-2
DOI :
10.1109/PSCE.2009.4840187