Recent test results on a 95 GHz, multi-megawatt gyrotron
Author
Cauffman, S. ; Blank, M. ; Borchard, P. ; Cahalan, P. ; Felch, K. ; Jory, H.
Author_Institution
Commun. & Power Ind., Inc., Palo Alto, CA, USA
fYear
2009
fDate
1-5 June 2009
Firstpage
1
Lastpage
1
Abstract
Summary form only given: A 95 GHz, multi-megawatt continuous-wave (CW) gyrotron oscillator is currently under development at CPI. The initial experimental campaign demonstrated peak output power levels up to 1 MW at 40 A beam current for pulse lengths up to 5 ms, and output power of 630 kW at 25 A beam current for pulse lengths up to 15 s. Modifications to the CPI test stand were then implemented to allow for short-pulse operation with beam currents up to 75 A. In the second experimental campaign, power levels up to 1.45 MW were obtained, but efficiency at high beam current was limited, apparently due to oscillations in the gyrotron beam tunnel. The gyrotron is currently (as of January, 2009) being rebuilt to address beam tunnel oscillations and to thereby improve beam quality in the interaction cavity. A third experimental campaign to test the rebuilt gyrotron is scheduled to occur within the next few months. Results of these tests will be presented.
Keywords
gyrotrons; beam tunnel oscillations; continuous-wave gyrotron oscillator; current 25 A; current 40 A; current 75 A; frequency 95 GHz; gyrotron beam tunnel; interaction cavity; multimegawatt gyrotron; power 1 MW; power 1.45 MW; power 630 kW; short-pulse operation; time 15 s; time 5 ms; Contracts; Gyrotrons; Job shop scheduling; Oscillators; Power generation; Power industry; Testing; USA Councils;
fLanguage
English
Publisher
ieee
Conference_Titel
Plasma Science - Abstracts, 2009. ICOPS 2009. IEEE International Conference on
Conference_Location
San Diego, CA
ISSN
0730-9244
Print_ISBN
978-1-4244-2617-1
Type
conf
DOI
10.1109/PLASMA.2009.5227688
Filename
5227688
Link To Document