DocumentCode
3221932
Title
A multilevel production control model for FMS with disturbances
Author
Golenko-Ginzburg, Dimitri ; Sinuany-Stern, Zilla
Author_Institution
Dept. of Ind. Eng. & Manage., Ben Gurion Univ. of the Negev, Beer Sheva, Israel
fYear
1988
fDate
23-25 May 1988
Firstpage
81
Lastpage
84
Abstract
A hierarchical flexible manufacturing system (FMS) is discussed. Three levels are considered-factory, section and machine-each level presenting a different stochastic optimization problem. The machines are universal. The rates of demand and the due dates are pregiven deterministically. Each machine processes parts with several possible speeds which are subject to disturbances. On the machine level, the problem is to determine for each unit at every routine control point the speed to proceed with and the timing of the next control point. There are chance constraints for each unit of the machine and section levels; there should not be a shortage with a pregiven confidence probability. On the upper levels, the problem is to reassign the target amounts among various units or to relocate the resources whenever any of the units fail to meet the chance constraints. Because of the interconnected nature of the problem, a change in the parameters of one results in changes to the solutions of the others
Keywords
flexible manufacturing systems; optimisation; production control; scheduling; FMS; control point; hierarchical flexible manufacturing system; multilevel production control model; resources; stochastic optimization; Actuators; Control systems; Engineering management; Error correction; Flexible manufacturing systems; Industrial engineering; Production control; Signal generators; Signal processing; Stochastic processes;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Integrated Manufacturing, 1988., International Conference on
Conference_Location
Troy, NY
Print_ISBN
0-8186-0888-9
Type
conf
DOI
10.1109/CIM.1988.5394
Filename
5394
Link To Document