Study on settlement of pile foundation of Sutong Bridge
Author :
Li, Xiaoyan ; Chen, Zhijian ; Jie Chen ; Ruan, Huaining
Author_Institution :
Coll. of Earth Sci. & Eng., Hohai Univ., Nanjing, China
fYear :
2011
fDate :
22-24 April 2011
Firstpage :
772
Lastpage :
775
Abstract :
The settlement behavior of pile foundations is an important index for construction control and design verification especially for bridges built on poor hydrologic and geologic conditions. Settlement calculation methods are appraised firstly. Considering engineering conditions and characteristics of pile foundations of the two main piers in the Sutong Bridge, Improved Equivalent Pier Method (IEPM) is proposed, and its calculation process is given. Take the North Main Pier foundation as an example, settlement calculated with IEPM was assessed to be 120.6 mm. When compared to measured pile settlements, the IEPM had relatively good matches. Two other methods to determine pile settlements were also undertaken and compared. The comparisons indicate that the IEPM was applicable for Sutong Bridge, and could be considered for use in other similar engineering projects.
Keywords :
bridges (structures); construction; foundations; Sutong bridge; construction control; construction design verification; improved equivalent pier method; north main pier foundation; pile foundation; Bridges; Monitoring; Shafts; Soil; Steel; Stress; Tides; Improved Equivalent Pier Method; Sutong Bridge; monitoring; settlement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location :
Lushan
Print_ISBN :
978-1-4577-0289-1
Type :
conf
DOI :
10.1109/ICETCE.2011.5774562
Filename :
5774562
Link To Document :
بازگشت