Title :
Study of klystron modulator system availability for PLS 2-GeV electron linac
Author :
Park, S.S. ; Oh, J.S. ; Park, S.W. ; Cho, M.H. ; Namkung, W.
Author_Institution :
Accel. Lab., Pohang Inst. of Sci. & Technol., South Korea
Abstract :
The PLS linac has been injecting 2-GeV electron beams to the Pohang Light Source (PLS) storage ring since September 1994. PLS 2-GeV linac has 11 units of high-power pulsed klystron-modulator (K&M) system for the main RF sources for the beam acceleration. The klystron has rated output peak power of 80-MW at 4 μsec pulse width with 120 pps, and the matching modulator has 200-MW peak output power. The total accumulated high voltage run time of the oldest unit has reached beyond 20000 hours and the sum of all the high voltage run time is approximately 180000 hours. In this paper, we review overall system performance of the high power K&M system together with the description of the K&M system. A special attention is paid on the analysis of all failures and troubles of the K&M system which affected the linac RF operations as well as beam injection operations for the period of 1994 to May 1996
Keywords :
electron accelerators; failure analysis; klystrons; power supplies to apparatus; pulsed power technology; storage rings; 2 GeV; 200 MW; 4 mus; 80 MW; Pohang Light Source electron linac; RF sources; accumulated high voltage run time; beam acceleration; beam injection operations; failures analysis; high-power pulsed klystron-modulator; klystron modulator system availability; matching modulator; overall system performance; rated output peak power; storage ring; Acceleration; Electron beams; Klystrons; Light sources; Linear particle accelerator; Particle beams; Pulse width modulation; Radio frequency; Storage rings; Voltage;
Conference_Titel :
Power Modulator Symposium, 1996., Twenty-Second International
Conference_Location :
Boca Raton, FL
Print_ISBN :
0-7803-3076-5
DOI :
10.1109/MODSYM.1996.564483